How long does website copywriting take?
A first draft of one landing page takes about a week at fixed-price studios that publish timelines. A homepage plus core pages takes 4 to 5 weeks. Most of the time goes to research and approvals, not typing. Projects run long when the position isn't settled, proof isn't ready, or too many people sign off. At Pagetear, turnaround depends on the plan you choose.
- One pageAbout a week to a first draft.
- A full site4 to 5 weeks, published.
- What slows itPosition, proof and sign-off.
Published timelines
From each provider's own page. Checked Nov 24, 2026.
| Project | Timeline | Source |
|---|---|---|
| One landing page, first draft | 5 business days | CopywriterLabs "Essential": first draft in 5 business days from kickoff, and they say that's the draft, not draft plus revisions. 1 revision round. CopywriterLabs |
| Fastest package | 4 business days | Launch Copywriter lists "fastest turnaround 4 business days" across its fixed packages. Launch Copywriter |
| Sales page plus 2 headline variants | 10 business days | CopywriterLabs "Professional", 2 revision rounds. CopywriterLabs |
| Sales page, 3 ad sets and 2 emails | 15 to 20 business days | CopywriterLabs "Authority", 3 revision rounds. CopywriterLabs |
| Homepage and up to four core pages | 4 to 5 weeks | Lengualistic, messaging plus copy, 2 revision rounds, fully async. Lengualistic |
| Pagetear, any project | Depends on the plan | Plans run 1 to 4 projects a week, $2,000 to $5,000 a month. One project is one page, one email sequence or one ad set. Ask about timing for your plan on the intro call. |
What will slow yours down
Why the timelines vary so much
Writing a page is the short part. The long parts are learning the product, settling what the page should claim, and getting a yes from everyone who has a say. A writer who starts with a settled position and ready proof can move fast. One who has to settle the position first is really doing a positioning project, and that takes weeks.
Revision rounds add time too. Each round is a full read by your team, plus the rewrite. Ask how many rounds are included and how long each one takes before you agree to a date.
Some directory listings still show an old turnaround promise for Pagetear. The real answer is the one on our pricing: turnaround depends on the plan you choose.
Questions answered
How long does it take to write a landing page?
Fixed-price studios that publish timelines quote about a week for a first draft of one landing page: 5 business days at CopywriterLabs, with 4 business days the fastest package at Launch Copywriter. Checked Nov 24, 2026. Revisions add time on top.
How long does a full website rewrite take?
A homepage and up to four core pages takes 4 to 5 weeks at Lengualistic, including messaging work and 2 revision rounds. Checked Nov 24, 2026.
How fast is Pagetear?
Turnaround depends on the plan you choose. Plans run from 1 to 4 projects a week, $2,000 to $5,000 a month. Ask about timing for your plan on the intro call.
What makes a copywriting project take longer?
An unsettled position, proof that isn't ready, several people signing off, no written brief, and design that starts before the copy is done.
Can I speed up a copy project?
Send a written brief, name one person who signs off, gather your proof before kickoff, and let design wait for approved copy.
Who writes the copy at Pagetear?
Blake Emal writes every word himself. He is a 3x Head of Marketing and has written conversion copy for more than 10 years. Pagetear does not use AI to write your copy.
Have a launch date coming?
Book 15 minutes. Bring the date and the page, and Blake will tell you honestly what fits, even if you never hire Pagetear.
Book a call